土建中文翻译.doc
《土建中文翻译.doc》由会员分享,可在线阅读,更多相关《土建中文翻译.doc(35页珍藏版)》请在沃文网上搜索。
1、TABLE OF CONTENTS4.1.4 PARTICULAR SPECIFICATION CIVIL WORKS . 804.1.4.1 General . 804.1.4.1.1 Location of the Works. 804.1.4.1.2 Type of Works . 804.1.4.1.3 Switchgear Building . 804.1.4.1.4 Sequence of Construction . 804.1.4.1.5 Drawings . 814.1.4.1.6 Use of Site. 814.1.4.1.7 Plan of Operations and
2、 Temporary Works .814.1.4.1.8 Contractors Office and Accommodation, etc. . 814.1.4.1.9 Dealing with Water . 814.1.4.1.10 Liaison with Police and Other Officials .814.1.4.1.11 Explosives and Blasting. 824.1.4.1.12 Works Executed by theProject Manager orby Other Contractors . 824.1.4.1.13 Water Suppli
3、es for the Works . 824.1.4.1.14 Employers Approval of Finished Works . 834.1.4.1.15 Preservation of Trees. 834.1.4.1.16 Survey Beacons . 834.1.4.1.17 Basic Survey and Setting Out . 834.1.4.2 EARTHWORKS . 834.1.4.2.1 Bush Clearing. 834.1.4.2.2 Access and Internal Roads. 844.1.4.2.3 Removal of Top Soi
4、l. 874.1.4.2.4 Classification of Materials . 874.1.4.2.5 Order of Work. 874.1.4.2.6 Fill Material . 884.1.4.2.7 Spoil Material . 894.1.4.2.8 Expansive Material . 894.1.4.2.9 Surplus Material . 894.1.4.2.10 Side Drains. 894.1.4.2.11 Excavation in Rock . 894.1.4.2.12 Setting Out and Preparation for Ea
5、rthworks . 904.1.4.2.13 Construction of Earthworks to Formation . 904.1.4.2.14 Unsuitable Material Information. 904.1.4.2.15 Spreading and Compaction of Embankment and Fills. 904.1.4.2.16 Drainage of Works. 904.1.4.2.17 Sub-grade Layer. 914.1.4.2.18 Tolerances . 914.1.4.2.19 Protection of Embankment
6、 Slopes. 914.1.4.2.20 Grassing of Slopes. 914.1.4.2.21 Borrow Pits. 914.1.4.2.22 Soil Sterilisation . 924.1.4.2.23 Earth Electrode . 924.1.4.2.24 Platform Areas. 924.1.4.3 MATERIALS FOR THE WORKS. 924.1.4.3.1 General . 924.1.4.3.2 Standards . 924.1.4.3.3 Filter Backfill for Sub-soil Drains . 934.1.4
7、.3.4 Stone for Pitching . 934.1.4.3.5 Stone for Platform Surfacing . 934.1.4.4 DRAINAGE AND STORM WATER . 934.1.4.4.1 Drainage . 934.1.4.5 FENCING . 944.1.4.5.1 Fencing . 944.1.4.5.2 Dimensions. 944.1.4.5.3 Materials . 954.1.4.5.4 Installation . 954.1.4.6 CONCRETE AND BUILDING WORKS . 964.1.4.6.1 Ea
8、rthworks . 964.1.4.6.2 CONCRETE, FORMWORK AND REINFORCEMENT . 974.1.4.6.3 BUILDERS WORK . 1014.1.4.6.4 PLASTER AND FLOOR COVERINGS. 1064.1.4.6.5 GLAZING AND PAINTING . 1074.1.4.6.6 SUBSTATION BUILDING SIZES. . 1094.1.4.6.7 IRONMONGERY AND METALWORK. 1094.1.4.6.8 ELECTRICAL INSTALLATION . 1104.1.4 PA
9、RTICULAR SPECIFICATION CIVIL WORKS 土建4.1.4.1 General 总则4.1.4.1.1 Location of the Works 位置The locations of the sites are as described under the relevant clauses in scope of works in Volume 2. 位置见Volume 2中的相关条款4.1.4.1.2 Type of Works 工作类型The works to be constructed under this Contract include the foll
10、owing: 包括以下这些工作Work for access road 入口公路的工程- Earthworks for sub-station platform 变电站平台地基工作- Subsoil drains and storm water drains地基排水渠及雨水渠- 100 mm thick layer of stone to platform surface 100毫米厚到平台表面的一层石头- Fencing 围栏- Concrete bases and Stub columns 混凝土地基和短柱- Cable Trenches电缆沟- Switchgear Building T
11、ransformer foundations开关基建变压器基础- Any other works necessary for full completeness其他完成工程所需的工作4.1.4.1.3 Switchgear Building 开关基建The switchgear building shall contain the following rooms: 包含以下工作l Switchgear room to accommodate the entire switchgear panels plus a space that would accommodate 6 more feede
12、r panels in the future. 开关室,可以容纳整个开关面板,并且还有一个空间,将来可容纳其余6个馈线面板l Battery room (to accommodate both protection and communication batteries) 电池室(容纳保护和通信电池)l Battery Charger, AC/DC Room. 电池充电器,交流/直流室l Control and Protection Panel room to accommodate the necessary Protection and control panels and space f
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10 积分
下载 | 加入VIP,下载更划算! |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 土建 中文翻译