1、华北科技学院毕业设计 外文翻译NATM tunnel design principle in the construction of major and Construction TechnologyW.BroereI.The NATM Design Principle1.Tunnel design and construction of two major theoretical and development process Since the 20th century, human space on the ground floor of the growing demand, thus
2、 the underground works of the study of a rapid development. In a large number of underground engineering practice, it is generally recognized that the tunnel and underground cavern project, the core of the problem, all up in the excavation and retaining two key processes. How excavation, it will be
3、more conducive to the stability and cavern facilitate support : For more support, Supporting how they can more effectively ensure stability and facilitate the cavern excavation. This is the tunnels and underground works two promote each other and check each others problems. Tunnels and underground c
4、averns, and focusing on the core issues with the above practice and research, in different periods, People of different theories and gradually established a system of different theories, Each system includes theory and resolve (or are studying the resolution) from the works of understanding (concept
5、), mechanics, engineering measures to the construction methods (Technology), a series of engineering problems. A theory of the 20th century the 1920s the traditional load relaxation theory. Its core content is : a stable rock self-stability, no load : unstable rock may have collapsed. need shoring s
6、tructure to be supported. Thus, the role of the supporting structure of the rock load is within a certain range may be due to relaxation and collapse of rock gravity. This is a traditional theory, and their representative is Taishaji and Principes and others. It works similar to the surface issues o
7、f the thinking is still widely used to. Another theory of the 20th century made the 1950s the modern theory of timbering or rock for the theory. Its core content is : rock stability is clearly bearing rock to their own self-stability : unstable rock loss of stability is a process, and if this proces
8、s in providing the necessary help or restrictions will still be able to enter the rock steady state. This theoretical system of representative characters Labuxiweici, Miller-Feiqieer, Fenner - Daluobo and Kashitenai others. This is a more modern theory, it is already out of the ground works to consi
9、der the ideas, and underground works closer to reality, the past 50 years has been widely accepted and applied. demonstrated broad development prospects. Can be seen from the above, the former theory more attention to the findings and the results of treatment : The latter theory is even more attenti
10、on to the process and the control of the process, right from the rock for the full utilization of capacity. Given this distinction, which both theory and methods in the process, each with different performance characteristics. NATM theory is rock for the tunnel engineering practice in the representa
11、tion method.2. NATM NATM that the new Austrian Tunneling Method short the original is in New Austrian Tunneling Method, referred to as the NATM. France said it convergence bound or some countries alleged to observe the dynamic design and construction of the basic principles. NATM concept of filibust
12、ering Xiweici Austria scholars in the 20th century, Professor age of 50. It was based on the experience of both the tunnel and rock mechanics theory, will bolt and shotcrete combination as a major means of supporting a construction method, Austria, Sweden, Italy and other countries, many practical a
13、nd theoretical study in the 1960s and patented officially named. Following this approach in Western Europe, Scandinavia, the United States and Japan and many other underground works with a very rapid development, have become modern tunnels new technologies landmark. Nearly 40 years ago, the railway
14、sector through research, design, construction combining, in many construction of the tunnel, according to their own characteristics successfully applied a new Austrian law, made more experience, have accumulated large amounts of data, This is the application stage. However, in the road sector NATM o
15、f only 50%. Currently, the New Austrian Tunneling Method almost become weak and broken rock section of a tunnel construction method, technical and economic benefits are clear. NATM the basic points can be summarized as follows : (1). Rock tunnel structure is the main loading unit, the construction m
16、ust fully protect the rock, it minimize the disturbance to avoid excessive damage to the intensity of rock. To this end, the construction of sub-section should not block too much, excavation should be used smooth blasting, presplit blasting or mechanical tunneling.(2). In order to give full play to
17、rock the carrying capacity should be allowed to control and rock deformation. While allowing deformation, which can be a rock bearing ring; The other hand, have to limit it, Rock is not so lax and excessive loss or greatly reduced carrying capacity. During construction should be used with rock close
18、 to, the timely building puzzle keeps strengthening Flexible support structure, such as bolting and shotcreting supporting. This adjustment will be adopted supporting structural strength, Stiffness and its participation in the work of the time (including the closure of time) to control the deformati
19、on of the rock mass. (3). In order to improve the support structure, the mechanical properties, the construction should be closed as soon as possible, and to become a closed cylindrical structure. In addition, the tunnel shape with a round should, as far as possible, to avoid the corner of the stres
20、s concentration. (4). Construction right through the rock and supporting the dynamic observation, measurement, and reasonable arrangements for the construction procedures, changes in the design and construction management of the day-to-day. (5). To lay waterproof layer, or is subject to bolt corrosi
21、on, deterioration of rock properties, rheological, swelling caused by the follow-up to load, use composite lining. (6). Lining in principle, and the early rock deformation Supporting the basic stability of the conditions under construction. rock and supporting structure into a whole, thereby improvi
22、ng the support system of security. NATM above the basic elements can be briefly summarized as : less disturbance, early spray anchor, ground measurements, closed tight.3With a spring to understand the principle NATM (1). Cavern brink of a point A in the original excavation ago with stress (stress se
23、lf-respect and tectonic stress) in a state of equilibrium. As an elastic stiffness of the spring K, P0 under compression in a state of equilibrium. (2). Cavern excavation, A point in attacking lose face constraints, the original stress state to be adjusted, if the intensity of rock big enough, After
24、 less stress adjustments may cavern in a stable condition (without support). But most of the geological conditions of the poor, that is, after the stress cavern adjustments, such as weak protection, we could have convergence deformation, even instability (landslides), must be provided to support pow
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10 积分
下载 | 加入VIP,下载更划算! |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 新奥法 设计 原理 隧道 施工 中的 应用 主要 施工工艺 论文 翻译