1、 Underground MiningMost present-day mining in Europe occurs under 2000 to 4000 ft of overburden, as more easily mined coal deposits have been depleted. At this depth most mines are developed as shaft mines. All personnel, material, and coal have to be hoisted trough these shaft. Considering the two
2、factors of hoisting capacity and required length of shaft, a considerable investment is necessary to reach the coal-bearing strata. The requires huge investments. Openings at this depth have to be equipped with costly supports, and periodic reworking and repair is necessary.Mines not only extend hor
3、izontally but also vertically through the development of new levels. The life of the mines is thus extend considerably, and surface installations can be amortize over a longer period.The more limited reserves have forced companies into mining less favorable deposits, and European government require
4、that all possible deposits be mined to conserve the nations energy resources. These factor and the large percentage of inclined seams and faults make mining very difficult and costly. The population density and the heavy surface buildup cause additional expense in the form of payments for subsidence
5、 damage to surface structures. Therefore, backfilling is frequently practiced to reduce subsidence. The close spacing of faults often severely limits the size of a mining section, forcing frequent moves and excessive development work.The thickness of the overburden results in very high ground pressu
6、re. This would require extremely large pillars if the room and pillar method was applied. Additionally, support is required for any opening, adding prohibitive costs to a multiple-entry room and pillar operation.As a result, single-entry longwall operations requiring the minimum number of entries an
7、d allowing maximum recovery of resources is the mining method almost exclusively practiced.Shaft mines dominate the European coal mining industry. Shafts 20 to 30 ft in diameter, with circular cross section, lined with masonry, concrete, or steel are the dominant means of gaining access to the coal-
8、bearing strata. They are often extended beyond the last mining level to provide for future expansion. As in the Unite States, shafts are developed by drilling, blasting, and excavating or by large-diameter shaft-boring equipment. Shaft boring is more frequently used, particularly on the smaller and
9、shorter subshaft, which connect the different levels but do not extend to the surface.Haulage in the shaft is usually accomplished by hoisting of the filled mine cars on multistage cages or by skips. Pumping of coal slurry is also done in special cases.The complex system of forces and the resulting
10、rock mechanical problems developed by mining activities at different levels result in significant differences between European and US underground development. The rock mechanical interaction of the extraction operations at the various levels require that all deposits be mined as completely as possib
11、le. Pillars left after mining create zones of extreme and often unmanageable ground control problem, as well as a high probability of roof bounce. Since the number of entries is kept to a minimum because of cost, no bleeder systems are provided. If retreat mining is practiced, only two entries are a
12、dvanced in to a new mining area.Panels are laid out as large as possible. The large-panel layout is used as another means of reducing the number of entries. Mindedout panels are sealed off to prevent spontaneous combustion through the removal of oxygen.The main levels, with extensive entry systems,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10 积分
下载 | 加入VIP,下载更划算! |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 采矿工程 毕业设计 英文翻译 毕业论文