采矿工程专业毕业设计外文文献翻译(中英文翻译).doc
《采矿工程专业毕业设计外文文献翻译(中英文翻译).doc》由会员分享,可在线阅读,更多相关《采矿工程专业毕业设计外文文献翻译(中英文翻译).doc(8页珍藏版)》请在沃文网上搜索。
1、外文原文:Adopt the crest of the coal work noodles plank management problem studyCrest the plank management is the point that adopts a safe management of the coal work noodles.Statistics according to the data, crest the plank trouble has 60% of the coal mine trouble about, adopting the trouble of the coa
2、l work noodles and having a crest 70% of the plank trouble above.Therefore, we have to strengthen a plank management, reducing to adopt the coal work noodles crest the occurrence of the plank trouble.1,the definition of the crest,scaleboard and it categorizeEndow with the existence coal seam on of t
3、he close by rock strata be called a plank, endow with the existence coal seam under of the close by rock strata be called scaleboard.Crest the rock,strength of the scaleboard and absorb water sex and digging to work the management of the noodles contain direct relation, they is certain crest the pla
4、nk protect a way and choose to adopt the empty area processing method of main basis. 1.1 planks categorizeAccording to rock,thickness and return to adopt process to fall in the 垮 of difficult easy degree, crest the plank is divided into the false crest,direct crest and old crest.According to direct
5、crest sport to adopt a field to the influence for press, the direct crest is divided into broken up,unsteady,medium etc. stability,stability,strong and tough crest plank etc. is five.According to old crest the sport Be work mineral inside the noodles press to present degree and to work safe threat o
6、f noodles of size, the old crest is is divided in to press very and severely, press mightiness, press to compare obviously, dont obviously press etc. is four. 1.2 scaleboards categorizeAccording to the opposite position relation of the rock strata and the coal seam, the scaleboard is divided into di
7、rect bottom with the old bottom.Locate coal seam directly under of the rock strata be called direct bottom;locate the direct bottom or coal seam under of the rock strata be called old bottom.The coal seam crest the scaleboard type expects the influence of the geology structure sport after be subject
8、ed to the deposition environment and, its growth in different region degree dissimilarity, the coal seam possibility for have isnt whole. 2,crest that need to be control plank classification and adopt the processing way of the empty areaAccording to different crest the plank type and property, choos
9、e to pay to protect a way and adopt the empty area processing method differently, is a plank management of basic principle. 2.1 crest needed to pull to make plank classificationPress a knothole rock strata strength, the crest plank that needs to be control can is divided into: general crest the plan
10、k,slowness descend to sink a plank and is whole fall the crest of the cave in the danger plank etc. 2.2 work noodles adopt the processing method of the empty areaThe processing method that adopts empty area mainly has: all 垮s fall a method,partial full to fill a method,the coal pillar to prop up a m
11、ethod to alleviate to descend to sink a method slowly etc. 3,crest the plank pressure present a characteristic 3.1 top the cover rock strata of the sport regulation and the work in front pay to accept pressure to distribute behindDuring the period of mine, adopt empty area above of the rock strata w
12、ill take place ambulation, according to crest the plank change mind condition, taking the cranny rock strata in up the cover rock strata follow the work noodles to push forward the direction demarcation as three areas: the coal wall prop up the influence area,leave layer area and re- press solid are
13、a.The noodles opens to slice an eye to go to push forward forward in the process from the work, break original should the equilibrium of the dint field, cause should the dint re- distribute.Be adopting the coal work noodles to become to pay to accept pressure in front and back, it concretely distrib
14、utes shape to have something to do with adopting the empty area processing method. 3.2 first times to press to press a main manifestation with the periodFirst time to press a main manifestation:BE a plankby oneself the vield song range enlargement;the coal wall transform and fall to fall(the slice h
15、elp);pay to protect to drill bottom etc.First time to press to want to keep on more and suddenly and generally for 2-3 days.Period to press a main manifestation:Main manifestation BE:crest the plank descend to sink nasty play increment of speed, crest the plank descend to sink quantity to become big
16、;pay what pillar be subjected to load widespread increment;adopt empty area to hang a crest;pay pillar to make a noise;cause the coal wall slice to help,pay pillar to damage,crest plank occurrence the step descend to sink etc.If pay the pillar parameter choice to be unsuited to a proper or single bo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10 积分
下载 | 加入VIP,下载更划算! |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 采矿工程 专业 毕业设计 外文 文献 翻译 中英文