1、Efficient Planning of Substation AutomationSystem CablesAbstract The manual selection and assignment of appropriate cables to the interconnections between the devices of a substation automation system is a major cost factor in substation automation system design. This paper discusses about the model
2、ing of the substation automation system cable planning as an integer linear optimization problem to generate an efficient cable plan for substation automation systems.1 IntroductionCabling between different devices of a substation automation system (SAS) is a major cost factor in the SAS design proc
3、ess. Usually computer aided design software is used to create the design templates of SAS devices and their interconnections. The design templates are then instantiated in a SAS project and the cables are manually assigned to the connections. The selection and assignment of cables to connections mus
4、t follow certain engineering rules. This engineering process is usually time consuming and can cause engineering errors, thereby increasing the engineering cost. Apparently, the SAS cable planning is related to the well known bin packing problem. The SAS cable planning can be formulated as an intege
5、r linear optimization problem with the cable engineering rules expressed as a set of linear constraints and a cost objective for minimizing the total cable cost. This paper describes the formulation of SAS cable planning problem as an integer linear optimization problem and presents the results for
6、some representative test cases. To the best of the authors knowledge the work is the first of the kind to study SAS cable planning. The paper is organized as follows. Section 2 presents an overview of the SAS cable planning process. Section 3 expresses the SAS cable planning problem as an integer li
7、near optimization problem. The results obtained by solving the optimization problem using some solvers is presented in Section 4. Section 5 draws some conclusions of this work.2 SAS Cable PlanningThe SAS cable planning begins after the system design phase of a SAS project.The SAS cable planning is a
8、t present done manually by computer aided designT. Achterberg and J.C. Beck (Eds.): CPAIOR 2011, LNCS 6697, pp. 210214, 2011.cSpringer-Verlag Berlin Heidelberg 2011Efficient Planning of Substation Automation System Cables 211Fig. 1. Fields, devices and their interconnections(CAD) engineers. The diff
9、erent design templates corresponding to the actual devices of a SAS are instantiated in one or more CAD jobs. Each job consists of one or more sheets and each sheet has fields which are logical groups of devices as shown in Figure 1. Moreover, a field corresponds to a physical assembly interface cla
10、ss e.g. Metering box, Protection cubicle etc. Each device has pins which are the physical interconnection interfaces of the device. A valid connection is a unique path between exactly two pins and every connection carries a physical signal. A signal can traverse over one or more connections. Each co
11、nnection is assigned to exactly one of the conductors of a cable. The type of cables to which the connections are assigned is based on cable engineering rules. The cable engineering rules can be classified into two types, namely the cable rules and the signal rules. The cable rules specify the allow
12、ed cable types for a set of connections. It can also specify the number of spare conductors which must be left free in each instance of the allowed cable types. The signal rules specify restrictions on allocation of connections which carry signals that should not be allocated to the same cable or pr
13、eferably allocated to the same cable. The current practice is to manually select and assign cables to connections according to the cable engineering rules. This procedure is time consuming and can cause engineering errors thereby increasing the engineering cost. In what follows is the formulation of
14、 the SAS system cable planning as an integer linear optimizationproblem with which a more efficient cable plan for SAS can be generated.3 Integer Linear Program FormulationThe SAS cable planning problem is divided into sub problems where each sub problem considers connections between distinct set of
15、 field pairs within a given set of CAD jobs. The rationale behind this decomposition is that the cable plan should consider the physical assembly interface classes and should not mix connections between two different source or destination physical assembly interface classes in one cable. This is ens
16、ured by deriving a cable plan for each distinct field pairs. Let C = 1, 2, 3, . . .,N represent the set of all connections between two field pairs, where N is the total number of connections, and K = 1, 2, 3, . . .,M212 T. Sivanthi and J. Polandrepresent the set of all cable types, where M is the to
17、tal number of cable types in a sub problem. In a cable instance, there can be one or more connections and we refer to the connection with lowest index among all connections in the cable instance as the leader and the other connections as the followers. This implies that all connections except the fi
18、rst connection in C can either be a leader or follower. Moreover, based on the signal rules a set of connection pairs X can be derived where each (i,i) X represents the connections i andi that must not be assigned to the same cable. Let C be the set of connection pairs (i,i) where i,i C, i i, (i,i)
19、/ X. We introduce the following binary variable Xi,i, where (i,i) C, which when true implies that connection i is a follower of a leaderi. (1)Similarly, based on the cable rules a set of connection cable pairs Y can be derived where each (i, j) Y implies that cable type j is not allowed for connecti
20、on i.Let K be the set of connection cable pairs (i, j), where i C, j K, (i, j) / Y. We introduce the following binary variable Yi,j, where (i, j) K , which when true implies that the leader i is assigned to an instance of cable type j. (2)Table 1 illustrates all binary variables corresponding to the
21、 example shown in Figure 1 for the case with two cable types K1 and K2. It is assumed that connections C1 and C3 cannot be assigned to the same cable and K1 is not an allowed cable type for connection C3. As mentioned before all connections except the first connection, which must be a leader, can ei
22、ther be a leader or follower. This is ensured by the following constraint. (3)A connection which is a leader in a cable cannot be a follower of a leader in another cable. This is expressed by the following constraint. (4)An implicit constraint of the cable planning problem is the capacity constraint
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10 积分
下载 | 加入VIP,下载更划算! |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 110 KV 变电站 电气 一次 系统 初步设计