1、 The Three Gorges ProjectsFirst. The dam site and basic pivot disposal The Three Gorges Projects is select to be fixed on San Dou Ping in Yichang, located in about 40 kilometers of the upper reaches of key water control project of Ge Zhou Ba which was built. River valley, district of dam site, is wi
2、den, slope, the two sidesof the bank is relatively gentlely. In the central plains have one island (island, fort of China,), possess the good phased construction water conservancy diversion condition. The foundation of pivot building is the hard and intact body of granite. Have built Yichang and gon
3、e to stride bridge that place of 4 kilometers in the about 28 -km-long special-purpose expressway of building site and dam low reaches -West Yangtze Bridge of imperial tomb. Have also built the quay of district of a batch of dams. The dam district possesses the good traffic condition.Two. Important
4、water conservancy project buildings1. dam The dam is a concrete gravity dam, which is 2309 meters long, its height is 185 meters , the dam is 181 meters high the most. Release floodwater dam section lie riverbed, 483 of the total length, consist of 22 form hole and 23 release floodwater in the deep
5、hole, among them deep hole is imported 90 meters , the mouth size of hole is 7*9 meters; Form hole mouth is 8 meter wide, overflow weir is 158 meters, form hole and deep hole adopt nose bank choose, flow way go on and can disappear. Dam section lies in and releases floodwater on a section of both si
6、des of the dam in the hydropower station, there are hydropower stations that enter water mouth. Enter water mouth baseplate height 108 meters. Pressure input water pipeline for carry person who in charge of, interior diameter 12.40, adopt the armored concrete to receive the strength structure. Make
7、and let out flow of 102500 cubic meters per second the most largely in the dam site while checking the flood.2. power stations The power stations adopt the type after the dam to assign the scheme, consist of two groups of factory buildings on left, right and underground factory building altogether.
8、Install 32 sets of hydroelectric generating set together, 14 factory buildings of left bank among them, 12 factory buildings of right bank, 6 underground factory buildings. The hydraulic turbine, in order to mix the flowing type, the specified capacity of the unit of the unit is 700,000 kilowatts.3.
9、 open up to navigation building The open up to navigation buildings include permanent lock and ship lift (of the the technological public relations, the steel cable that plans to be replaced with spiral pole technology in the original plan promotes technology), lie in the left bank. Permanent lock d
10、ouble-line five continuous chain of locks. Single grades of floodgate room effective size for 280*34*5, can pass the 10,000 ton-class fleet. The promoting type for single track first grade vertically of the ship lift is designed, it is 120*18*3.5 meters to bear the effective size of design of railwa
11、y carriage or compartment of ship, can pass a combination vessel of 3000 tons once. Total weight is 11800 tons to bear the design of railway carriage or compartment of ship when operating, it is 6000 newtons to always promote strength.Three. The major project amount and arranges in time limit The su
12、bject building of the project and major project amount of the water conservancy diversion project are: Excavate 102,830,000 cubic meters in cubic metre of earth and stone, fill out and build 31,980,000 cubic meters in cubic metre of earth and stone, concrete builds 27,940,000 cubic meters, 463,000 t
13、ons of reinforcing bars, make and fit 32 with hydroelectric generating set. All project construction tasks were divided into three stages and finished, all time limit was 17 years. The first stage (1993-1997 year) is preparation of construction and the first stage of the project, it takes 5 years to
14、 construct, regard realizing damming in the great river as the sign. The second stage (1998-2003 year) is the second stage, it takes 6 years to construct, lock as initial conservation storage of the reservoir, the first batch of aircrews generate electricity and is open up to navigation with the per
15、manent lock as. The third stage (2004-2009 year) is the third stage of the project, it takes 6 years to construct, regard realizing the sign all aircrews generate electricity and finish building with all of multi-purpose project as. One, two project finish as scheduled already, the third stage of th
16、e project in inside the plan to construct too, ship lift tackle key problems of not going on intensely.Four. Enormous benefit of the Three Gorges ProjectsThe Three Gorges Projects is the greatest water control project in China ,also in the world , it is the key project in controlling and developing
17、the Changjiang River. The normal water storage level of the Three Gorges Projects reservoir is 175 meters, installed capacity is 39,300 million cubic meters; The total length of the reservoir is more than 600 kilometers, width is 1.1 kilometers on average; The area of the reservoir is 1084 sq. km. I
18、t has enormous comprehensive benefits such as preventing flood, generating electricity, shipping,etc.1. prevent flood Primary goal of building the Three Gorges Projects is to prevent flood . The key water control project in Sanxia is the key project that the midstream and downstream of the Changjian
19、g River prevent flood in the system. Regulated and stored by the reservoir of Sanxia, form the capacity of reservoir in the upper reaches as river type reservoir of 39,300 million cubic meters, can regulate storage capacity and reach 22,150 million cubic meters, can intercept the flood came above of
20、 Yichang effectively, cut down flood crest flow greatly, make Jingjiang section prevent flood standard meet, improve from at present a about over ten years to once-in-a-hundred-year. Meet millennium first special great flood that meet, can cooperate with Jingjiang flood diversion partition applicati
21、on of flood storage project, the crushing calamity of preventing the occurrence of both sides of section of Jingjiang and bursting in the main dike, lighten midstream and downstream losing and flood threat to Wuhan of big flood, and can create conditions for administration of Dongting Hu district.2.
22、 generates electricityThe most direct economic benefits of the Three Gorges Projects is to generate electricity . Equilibrate the contradiction that contemporary China develops economic and serious energy shortage at a high speed, the hydroelectric resources that a clean one can be regenerated are u
23、ndoubtedly optimum choices. The total installed capacity of power station of Sanxia is 18,200,000 kilowatts, annual average generation is 84,680 million kilowatt hours. It will offer the reliable, cheap, clean regenerated energy for areas such as East China, Central China and South China of economic
24、 development, energy deficiency,etc.It play a great role in economic development and environmental pollution of reducing. Electric power resource that the Three Gorges Projects offers, if given a workforce of electricity generation by thermal power, mean building 10 more thermal power plants of 1,80
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10 积分
下载 | 加入VIP,下载更划算! |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 毕业设计论文 外文文献翻译 水利工程 三峡水利枢纽工程 中英文对照 毕业设计 论文 外文 文献 翻译 三峡 水利枢纽 工程 中英文 对照